Monday, April 13, 2009

1st day of 2nd week [6th day]

kohkoh...

my second week...

still in the SAF unit.. under MDF... biaselah... mengadap MDF setiap hari..

today i have learnt how to update the DP and e-side in the system dat have been done by (staff or contractor)s at the cabinet or DP. DP = distribution point. selalunya DP ni connection before drop wire ke rumah u all.. untuk pemasangan telefon..huhuh...~

mesti buat ni.. sebab .. kadang2 di kabinet or DP.. dah ada kekosongan.. contractor pulak tak call kita b4 pemasangan lalu trus pasang.. so..dalam system masih no pemasangan lama.. they suppose to call us 1st before they can install it.

thats why..we must check it back.. if the installation place in the system is available.. it is ok.
if not.. we must suggest the new place for the old number in the system to be placed. maksud saya.. DP pair or e-side yg lain..

after that.. note all the updates.. then call TM Taiping...

sebab Taiping sahaja yg boleh update system for Perak. mereka akan bagi reference number for us to record.

p/s : kiranya kita tolong check je la.. pastu real updates sume bg Taiping.. ades~

p/s : blaja mende ni sebab takde keje.. yela.. jumper MDF bukan nya tiap2 saat.. ade new installation baru buat...

p/s : sebenarnya gua tak reti sgt nak terangkan kat korang..lol~

lalalalala... tata~

No comments:

Post a Comment